Gaganyaan-1

Overview

Destination: Low Earth Orbit
Mission: Test Flight

Low Earth Orbit Satish Dhawan Space Centre Second Launch Pad Satish Dhawan Space Centre, India

First uncrewed orbital test flight of the Gaganyaan capsule.

Updates

Cosmic_Penguin • Oct. 25, 2024, 6:33 p.m.

NET February 2025.


Cosmic_Penguin • Oct. 14, 2024, 6:45 a.m.

NET late 2024.




Cosmic_Penguin • Feb. 4, 2024, 2:29 p.m.

NET 1H 2024.


LVM-3 (GSLV Mk III)

Family:
Configuration:

The Launch Vehicle Mark-3 (LVM-3), previously called Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk III), is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). It is designed to launch satellites into geostationary orbit, and is intended as a launch vehicle for crewed missions under the Indian Human Spaceflight Programme.

Specifications
  • Max Stage
    3
  • Length
    43.4 m
  • Diameter
    4.0 m
  • Fairing Diameter
  • Launch Mass
    629.0 T
  • Thrust
    11898.0 kN
Family
  • Name
    LVM-3 (GSLV Mk III)
  • Family
  • Variant
  • Alias
  • Full Name
    Launch Vehicle Mark-3 (GSLV Mk III)
Payload Capacity
  • Launch Cost
    $46000000
  • Low Earth Orbit
    10000.0 kg
  • Geostationary Transfer Orbit
    5000.0 kg
  • Direct Geostationary
  • Sun-Synchronous Capacity

Gaganyaan G1


Active Human Rated Unmanned Crew Capacity: 3
Destination: Low Earth Orbit
Serial Number: None

First operational Gaganyaan capsule.

Gaganyaan Details

Indian Space Research Organization

Indian Space Research Organization

(ISRO)

Chairman: S. Somanath Founded: 1969 Successes: 79 Failures: 13 Pending: 17

Agency Type:

The Indian Space Research Organisation (ISRO) is the space agency of the Government of India headquartered in the city of Bangalore. Its vision is to "harness space technology for national development while pursuing space science research and planetary exploration."

INFO WIKI

Related News

ESA

ESA to support Indian human spaceflight missions

On 4 December 2024, the European Space Agency (ESA) and the Indian Space Research organisation (ISRO) signed an agreement that will see ESA provide ground station support to the missions in ISRO’s Gaganyaan human spaceflight programme.

SpaceNews

India targets uncrewed Gaganyaan orbital test mission in July, crewed flight in 2025

India plans to conduct a first uncrewed orbital test flight for its Gaganyaan human spaceflight program in July this year.

The Launch Pad

ISRO Begins Gaganyaan Crew Capsule Recovery Trials With Indian Navy

Gaganyaan moves closer to first Domestic Crewed Flight for India after SM Engine Tests and Splash Down Tests with Indian Navy

Satish Dhawan Space Centre, India

Satish Dhawan Space Centre Second Launch Pad


Falcon 9
Success
12 hours, 41 minutes ago
O3b mPower 7 & 8
Launch Complex 39A - Kennedy Space Center, FL, USA

Seventh and eighth of a constellation of eleven high-throughput communications satellites in Medium Earth Orbit (MEO) built by Boeing and operated by…


Falcon 9
Success
21 hours, 48 minutes ago
NROL-149
Space Launch Complex 4E - Vandenberg SFB, CA, USA

Sixth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Office to…


Falcon 9
Success
1 day, 10 hours ago
GPS III SV07 (RRT-1)
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

GPS-III (Global Positioning System) is the first evolution stage of the third generation of the GPS satellites. It consists of the first ten (known a…


Long March 2D
Success
1 day, 16 hours ago
PIESAT-2 09-12
Launch Complex 9 - Taiyuan Satellite Launch Center, People's Republic of China

4 X-band synthetic-aperture radar Earth observation satellites for the Chinese Earth observation satellite company PIESAT.


Long March 5B/YZ-2
Success
2 days, 1 hour ago
SatNet LEO Group 01
101 - Wenchang Space Launch Site, People's Republic of China

A batch of 10 Low Earth Orbit communication satellites for the Chinese state owned SatNet constellation operated by the China Satellite Network Group…


Electron
Success
4 days, 10 hours ago
Stonehenge
Rocket Lab Launch Complex 2 (Launch Area 0 C) - Wallops Flight Facility, Virginia, USA

Sub-orbital launch of the Hypersonic Accelerator Suborbital Test Electron (HASTE) program for a confidential customer.


Falcon 9
Success
4 days, 13 hours ago
Starlink Group 11-2
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 22 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Long March 2D/YZ-3
Success
6 days, 3 hours ago
High Speed Laser Diamond Constellation Test System
Launch Area 4 (SLS-2 / 603) - Jiuquan Satellite Launch Center, People's Republic of China

5 prototype satellites for Low Earth Orbit communications satellite constellation testing, in 3 different orbits.


Falcon 9
Success
1 week, 3 days ago
Starlink Group 12-5
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Simorgh
Success
1 week, 5 days ago
Fakhr-1 & Saman-1
Imam Khomeini Spaceport - Semnan Space Center, Islamic Republic of Iran

Fakhr-1 is a 3U size cubesat to test locally produced spacecraft components, a communication payload and launch vehicle's multi-payload carrying capa…